Tom Price Mine Site

MINBARINGU were engaged by RIO TINTO to carry out the refurbishment of the HVAC systems at Tom Price mine site.  This included installation of Carrier, APAC, Comm Air Australia (CAA) and Daikin equipment for the following buildings located on Tom Price Mine site:

 

  • Upper MOC Substation – Chillers
  • Loadout Substation (Primary Unit)
  • Loadout Substation (Back-up Unit)
  • High Grade Substation (Back-up Unit)
  • Low-Grade Substation (Back-up Unit)
  • T9 Crib Room (Primary Unit)

T9 Offices (Primary Unit)

West Angelas Mine Site

MINBARINGU were engaged by RIO TINTO to undertake the replacement of HVAC package units and ducting to RTIO assets at West Angelas mine site.  This included replacement of APAC HVAC units, ductwork, controls and electrical services for the Crusher and Sampling substations.